Place the leading edge of the first panel along this line.
Ga rib metal roof installation instructions.
For use by its customers and is intended to be a guide only.
Install the roofing screws vertically along each rib in the panel.
3 5 rib installation guidelines caution.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof line.
This guide is supplied by fabral inc.
Preformed valley trim panel wood screw tuff rib panel.
Panel installation light gauge metal roof and wall panels installation guide for delta rib delta rib iii nor clad strata rib 2 corrugated panel installation procedure general 1.
Snap first two to three inches of panel together and slide the panel tight against the eave trim or with the gap depending on the temperature.
Place sealant over underlap rib before sliding hem over the eave trim.
Snap the panels together and fasten along the opposite side and top of the panel.
The installation of metal roof systems is a dangerous procedure and should be supervised by trained knowl.
Classic rib install guide.
It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame.
To guard against wind damage at the eaves and for a neatly finished appearance gable trim is recommended.
Install eave trim valley trim and inside closure prior study the details section of this manual prior to the to panel installation.
36 strata rib 29 gauge.
We strive to offer equal or even lower prices than competitors.
Butyl tape as shown below is recommended along panel side laps.
12 16 skyline roofing 26 gauge.
Measure one panel width in from the roof edge.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
36 nor clad 29 gauge.
This guide must by read in its entirety before beginning installation.
29 ga and 26 ga standard.
Available in the following metal roofing and siding.
Another option is to install a or 7 8 lap stitch screw in the crown of the rib to secure the side lap.
36 delta rib iii 29 gauge.
Metal roofing from georgia metals is higher quality but not necessarily higher priced.
24 ga optional 36 panel coverage 3 4 rib height.
At this point chalk a line from ridge to eave.
Install the roof substrate according to local building code requirements.
That said please beware when shopping for your metal roofing project sometimes a lower price may indicate a lower quality such as a thinner metal lower yield strength or an inferior paint.
5 rib roofing panels must be applied on a minimum roof pitch of 2 12 or greater.
25 years limited lifetime.