As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip.
Garage slab siding starter course 6 clearance.
By doing it ricks way you can leave the starter strip high enough off the slab to get the first course of vinyl into the starter strip and still prevent water from seeping under the shed.
I would put an 6 or 8 thick block 8 high on the existing slab.
Epoxy in some anchor bolts to keep the garage in place.
I have had better luck with white silicon than clear.
This article will examine just that question of the recommended distance from ground and siding your clearance is vitally important for the siding s long term protection and safeguard.
Siding materials need proper clearances between finish grade and the siding regardless the type of siding.
Amerimax 3 in x 120 in unpainted aluminum starter strip metal siding trim.
Foundation plates or sills shall be bolted or anchored to the foundation or foundation wall per the follow ing crc r403 1 6 and crc r602.
This should be nailed every 6 inches with it s lower edge running along the chalk line.
This requirement is not just to prevent damage to the siding it serves a couple of other functions as well.
If you have vinyl aluminum or steel siding it s probably easier to remove it from the entire garage wall and reinstall it after the addition is built.
The clear seems to debond from concrete after awhile.
For pricing and availability.
Maintaining proper clearances reduces access to wood structures behind the siding by wood destroying insects or damage from water that might.
Beyond the width of the addition to allow for 1 2 in.
The 8 height helps to get the garage up and above the present exterior grade and will be enough for the future.
Ever wonder if siding is too close to the ground.
Anchor bolts and sills.
A 6 mil polyethylene or approved vapor retarder with joints lapped minimum 6 inches shall be placed between a concrete slab on grade and the base course or subgrade.
Installing vinyl siding to an unlevel garage in this application throw the metal starter strip away after papering the wall with a two layers of 30 minute building paper install a j trim parallel to the bottom of the wood frame wall but overlapping its bottom 1 2 to 3 4 inch.
Do not use a j channel.
Flashing must be located beneath the first course of masonry above finished ground level above the foundation wall or slab and at other points of support including structural floors shelf angles and lintels when masonry veneers are designed per section r703 7.
Pry off the siding and remove the wall photo 2.
When building your new home have you ever wondered how close your siding needs to be from the ground.
Wall sheathing and 2 in.
We cut the wood siding 2 1 2 in.
Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle.